• 中文核心期刊要目总览
  • 中国科技核心期刊
  • 中国科学引文数据库(CSCD)
  • 中国科技论文与引文数据库(CSTPCD)
  • 中国学术期刊文摘数据库(CSAD)
  • 中国学术期刊(网络版)(CNKI)
  • 中文科技期刊数据库
  • 万方数据知识服务平台
  • 中国超星期刊域出版平台
  • 国家科技学术期刊开放平台
  • 荷兰文摘与引文数据库(SCOPUS)
  • 日本科学技术振兴机构数据库(JST)

套管钻井技术的早期井涌监测和井控技术措施的分析研究

An analytical study on early kick detection and well control considerations for casing while drilling technology

  • 摘要: 分析研究了套管钻井(casing while drilling, CwD)技术的早期井涌监测和井控技术措施,提出了一种利用数学模型来评估常规钻井和套管钻井技术的最大井涌余量和允许关井时间的简化方法。

     

    Abstract: Casing while drilling (CwD) technology is designed to reduce drilling time and expenses by improving the wellbore stability, fracture gradient, and formation damage while reducing the exposure time. However, for the purpose well control, the wellbore geometry and volumes differ from those obtained via a conventional drilling technique, thereby requiring a different approach. This study discusses well control principles for CwD operations. It presents a simplified method for evaluating the maximum kick tolerance and allowable well shut-in time for both conventional and CwD techniques using a mathematical model. Preliminary results revealed that the use of CwD leads to an annulus pressure loss three times higher than that observed in the conventional drilling. In addition, the kick tolerance is reduced by 50% and the maximum allowable well shut-in time is reduced by 65%, making an early kick detection system necessary.

     

/

返回文章
返回